Aconcagua Team Carried to Camp 1

Lorenz called in from the Plaza Argentina Base Camp at 4150m (13,600′) after the team carried loads to Camp 1 at right near 5000m (16,400′) earlier in the day. The mountain presented very challenging conditions for the team.  It was very cold and they climbed into a fierce wind, making for a very tough day…

Aconcagua Team is at Base Camp

Lorenz called in from the relative comfort of Base Camp, after a long day hiking up the Relinchos Valley.  Today was the toughest day of the trip thus far, as they gained over 3000′ of elevation as they hiked about seven miles from their camp at Casa De Piedra. The morning started with a crossing…