May 21 Team – Arrives at Camp 2

The May 21 team was able to move from Camp 1 at 7,200 ft to Camp 2 at 11,200 ft (3413m). After making breakfast, coffee, and melting snow for water this morning, the team broke down camp and packed everything up in backpacks and sleds. Once that task is done the team lays out their…

May 21 Team – Cache at Kahiltna Pass

The May 21 Team is feeling strong after hauling loads up Kahiltna Pass and digging in a gear cache for themselves. This day of the trip starts with the team heading out of Camp 1 7,800 ft (m) and carrying loads up the 1,800 ft (548 m) Ski Hill. This is a moderately difficult carry…