Today the June 15th team carried a load of equipment and supplies up to a cache site at 13,700′. The team is back at camp and it sounds like the team is doing well, moving efficiently, and looking forward to moving up to beautiful 14 camp in the Genet basin tomorrow, weather permitting. Zach called in the report tonight with a special message to loved ones:

