The June 17 Team was able to put in a cache of gear for the upper mountain on the 16k Ridge. The team made easy work of the headwall and ascending the fixed lines, which can often be a very difficult day because of the steep 45 degree slope angle and high altitude. Everyone is excited and looking forward to moving towards high camp!
Here’s climber Myra:
we are with the team!with love